Sinopharm Jiangsu Logistics Center Project

        The project can meet the needs of Jiangsu company's new business changes and business growth in the next 5-6 years, and support the logistics distribution center with a sales target of 5 billion. The distribution center covers an area of about 12,000 square meters.

         In this project, our company mainly undertakes the general contracting of the logistics system. The project has been officially opened.

        The equipment and system of the center are as follows:

        1) A set of AS/RS shelves;

        2) Five railroad stacking machines;

        3) A set of high forklift truck shelves;

        4) Two sets of shelf racking systems;

        5) A set of box picking and conveying systems;

        6) A set of pallet picking and conveying systems;

        7) A set of integrated logistics management software AutoWMSV1.0.

Baidu
sogou